Building Work (Weeks 10 to 12) – Door Frames Posted on 30 May 2015 by trishI had hoped that we could keep the door frames from the removed doorways and reuse them but apparently they were all slightly different so these new ones were made up.Installed in the WC Installed in the bathroom.