Building Work (Weeks 10 to 12) – WC

After much debate the position of the extractor fan was determined (you can see a previous candidate position indicated by the question mark below it).

Extract fan vent

This is the vent, it exits above the porch canopy.  It’ll get boxed in eventually.

Extractor vent

 

The WC then got skimmed.

Skimmed WC

The inspection chamber installed in week 5 got cemented in (that couldn’t be done until the building control officer had seen it).

Filled inspection chamber