Building Work (Weeks 10 to 12) – Bathroom

The holes from the removal of the wall and around the plasterboard were filled.

Filled holes


The wiring was put in for my over vanity light and the shaver socket.

Light and Shaver socket wiring


The ceiling and walls were skimmed.

Skimmed Bathroom


The bath was installed (almost – it’s not full connected up).

Bath installed


The shower drain was put in.

Shower drain